The disassembly is coming along much as was to be expected with the level of weathering & corrosion, generally difficult with a couple of truly ornery parts. The last of the Main fins to be removed on the first missile ( I am naming them Castor and Pollux to keep track) had two bolts which would NOT break free. Using a large breaker bar with 6 point socket and still no-go. The problem is the depth of where they are seated as well as the thinness of the head. Left with few alternatives I ended up drilling out the heads:
This will allow me another shot at getting out the balance of the stud since these were hardened shouldered bolts:That got the Main fins done so I started on the Guidance Antennas. These started off OK:
Until I got to the one that snapped the Impact screwdriver bit:
All told it is a slow go but still moving forward. The current state for the twins looks like this:Castor:
Pollux: